★★★★★ Trusted across Central Florida · Lifetime warranty
My Kitchen Reface
(407) 385-5861
Back

Full custom build

Cabinet Replacement

When refacing isn't enough — damaged boxes, layout changes, or a fully custom design — we tear out and rebuild from scratch with premium materials.

Get a Free Estimate
Brand new modern wood kitchen cabinets after replacement
Damaged demolished kitchen cabinets before replacement
BeforeAfter

National Installation Experience. Local Personalized Service.

What's included

  • Removal and disposal of existing cabinets
  • Custom-built cabinet boxes in plywood or MDF
  • Full-overlay or inset doors in your style
  • Soft-close hardware throughout
  • Layout redesign and pull-out organizers
  • Lifetime warranty

Our process

  1. 1

    Design consultation

    We map your ideal layout, storage, and finishes.

  2. 2

    Detailed quote

    Itemized pricing for cabinets, hardware, and labor.

  3. 3

    Demolition

    Old cabinets removed, hauled, and disposed of cleanly.

  4. 4

    Installation

    New cabinets installed and leveled — typically 1–2 weeks.

  5. 5

    Finishing touches

    Hardware, trim, and final adjustments.

Expert guide

Planning a full cabinet replacement

Replacement is the right call when you want a new layout, premium boxes, or a kitchen that lasts another 30 years. Here's what to think through before signing a contract.

Layout changes worth the cost

Replacement is your one chance to fix the floor plan. The changes that pay back the most in daily livability:

  • Adding or expanding an island for prep and seating
  • Moving the range to free up a sight line
  • Taller upper cabinets to the ceiling for storage and a cleaner look
  • Pantry tower or appliance garage instead of dead corners
  • Wider drawer banks beside the range for pots and lids

Cabinet box options

The box is what you're really buying — doors and finishes can be changed later. We build to the spec that fits your budget and how long you plan to stay.

  • 3/4" plywood boxes — our standard, holds screws and weight long-term
  • Furniture-grade MDF for painted finishes that won't telegraph grain
  • Full-overlay vs. inset doors (inset is premium and pricier)
  • Dovetailed solid-wood drawer boxes with undermount soft-close slides
  • Adjustable shelves with metal shelf clips, not plastic

Realistic project timeline

From the first measure to your final walkthrough, plan for 6–10 weeks. Here's how the calendar typically breaks down.

  • Week 1–2: Design, selections, and signed contract
  • Week 3–6: Custom shop build of boxes and doors
  • Week 7: Demolition and any plumbing/electrical rough-in
  • Week 8–9: Installation, countertop template and install
  • Week 10: Backsplash, hardware, and punch-list walkthrough

Frequently asked

How long does a full replacement take?+

Most full replacements run 2–3 weeks depending on kitchen size.

Can I change my layout?+

Yes — we can move walls of cabinets, add an island, or reconfigure entirely.

Do you handle plumbing and electrical?+

We coordinate with licensed trades for any required hookups.

What's the warranty?+

Lifetime warranty plus manufacturer warranties on materials and hardware.

Get a free estimate today

Prefer to run the numbers yourself? Try the free kitchen cabinet cost calculator.

Christopher Family of Brands

Refreshing more than your kitchen?

See our custom closets, pantries, and garage builds at Closets by Christopher — same craftsman, same lifetime warranty.

One craftsman. Two specialty workshops. Lifetime warranty on both.

Visit Closets by Christopher